FixVault

Capacitor, Ignition: Installation: 5.7L

  1. Install the ignition capacitors. Tighten the fasteners (1) to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
  2. Install the ignition capacitor wire harness connectors.
    GC0188314Courtesy of CHRYSLER GROUP, LLC
  3. Install the engine cover.
  4. Connect the negative battery cable.