Module, Transmission Control (EAB, DF1): Installation: Installation

Fig 1: Connector Area
GC0153041Courtesy of CHRYSLER GROUP, LLC
  1. Clean any debris or contaminants to the connector area.
    Fig 2: Transmission Control Module
    GC0153042Courtesy of CHRYSLER GROUP, LLC
  2. Use the positive locating feature on the electrical connector to orient the Transmission Control Module (TCM) prior to installation.
    Fig 3: Fasteners
    GC0153040Courtesy of CHRYSLER GROUP, LLC
  3. Install the TCM, tighten the fasteners to 25 N.m (18 ft. lbs.).
    Fig 4: TCM Markings
    GC0153039Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Do not turn the shaft more than 60 degrees to the marking, otherwise damage may occur.

  4. Be sure to match the position of the TCM markings (1).
    Fig 5: Transmission Control Module (TCM)
    GC0153038Courtesy of CHRYSLER GROUP, LLC
  5. Connect the manual shift lever to the TCM (1), tighten the fastener to 16 N.m (12 ft. lbs.)
  6. Connect the electrical connections to the TCM.
  7. Install the battery tray. Refer to TRAY, BATTERY, INSTALLATION .
  8. Reprogram the TCM. Refer to AW60T TCM PROGRAMMING PROCEDURE (CODE EAB) .