FixVault

Charging (Service Information): Generator: Installation: 1.4L

  1. Turn the generator as needed to push past the A/C compressor and the A/C lines in order to position the generator to the generator support bracket.
    GC0170954Courtesy of CHRYSLER GROUP, LLC
  2. Install both lower generator retaining bolts to 25 N.m (18 ft. lbs.) (1).
    GC0170950Courtesy of CHRYSLER GROUP, LLC
  3. Install the lower A/C compressor bolts (1).
    GC0170957Courtesy of CHRYSLER GROUP, LLC
  4. Position the A/C line support and install (1).
  5. Install the right side axle half shaft bearing support.
  6. Install the right side axle half shaft. Refer to INSTALLATION .
  7. Install the accessory drive belt.
    GC0170955Courtesy of CHRYSLER GROUP, LLC
  8. Tighten the top A/C compressor retaining bolt (1).
    GC0170945Courtesy of CHRYSLER GROUP, LLC
  9. Install the upper generator retaining bolt (1).
  10. Connect the negative battery cable.