FixVault

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
351CID Eng, Dual Air Pump13.4A
351CID Eng, Single Air Pump12.7A
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each0.2B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A