Placing System In Operation
After component service or replacement has been completed and all connections have been made, evacuate system thoroughly with a vacuum pump. Charge system with proper amount of refrigerant and perform a leak test. Be sure to check all fittings that have been opened. After system has been leak tested, make a system performance check.