FixVault

Test H: Step 15: Notes

15) Check Continuity of HEGO SIGNAL & POWER GROUND Circuits  Turn key off. Install breakout box, leaving ECA and HEGO disconnected. Set DVOM on 200-ohm scale and use the following test: