FixVault

Powertrain Control Module (PCM): Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the PCM and the bolts.
    • Tighten to 8 Nm (71 lb-in).
  2. Connect the 2 PCM electrical connectors.
  3. Install the battery tray. For additional information, refer to BATTERY, MOUNTING AND CABLES .
  4. Restore the module configuration. Carry out the module configuration restore steps of the Programmable Module Installation (PMI) procedure. For additional information, refer to MODULE CONFIGURATION .
  5. Reprogram the Passive Anti-Theft System (PATS). Carry out the Parameter Reset procedure. For additional information, refer to ANTI-THEFT - PASSIVE ANTI-THEFT SYSTEM (PATS) .
  6. Using the scan tool, perform the Misfire Monitor Neutral Profile Correction procedure following the on-screen instructions.