FixVault

Cooling Module - 2.5L: Installation

  1. To install, reverse the removal procedure.
  2. Fill and bleed the cooling system. Refer to COOLING SYSTEM DRAINING, FILLING AND BLEEDING .
  3. Evacuate, leak test and charge the A/C system:

    For EATC system, refer to CLIMATE CONTROL SYSTEM - ELECTRONIC MANUAL TEMPERATURE CONTROL (EMTC) .

    For DATC system, refer to CLIMATE CONTROL SYSTEM - DUAL AUTOMATIC TEMPERATURE CONTROL (DATC) .