Solenoid Body: Installation
- 2.NOTE: Make sure that a new component is installed.
Install the new separator plate and the separator plate-to-solenoid body bolts.
Torque: 89 lb.in (10 Nm)
- 3.
Position the solenoid body on the main control valve body and install the solenoid body-to-valve body bolts.Torque: 89 lb.in (10 Nm)
- 4.
Install the main control valve body. Refer to: Main Control Valve Body .