Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line4,1.9L Eng7.45.2A
Additional Procedure: VALVE: Grind Complete:
In-Line4,Gas,1.9L Eng, Where Air Cond interferes add0.80.8A
In-Line4,Gas,1.9L Eng, Where Pwr Strg interferes add0.40.4A
Where Air Pump interferes add0.20.2A
Where Cruise Control interferes add0.2A
Where Elect Eng System interferes add0.5A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
In-Line4,1.9L Eng,O.H.C.- SOHC,Gas, Each0.4B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each Additional0.2B
One0.3B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B