FixVault

Installation Procedure

    Fig 1: Boost Sensor & Bolts
    GM26957Courtesy of GENERAL MOTORS CORP.
  1. Install the port gasket on sensor.
  2. Install the sensor.
  3. NOTE: Refer to Fastener Notice in Cautions and Notices.
    Fig 2: Boost Sensor Mounting Bolts
    GM73423Courtesy of GENERAL MOTORS CORP.
  4. Install the mounting bolts.

    Tighten:  Tighten the mounting bolts to 3.5 N.m (27 lb in).

  5. Install the electrical connector.
  6. Install the negative battery cables.