FixVault

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
  1. Install the port gasket on sensor.
  2. Install the sensor.
    Fig 1: Boost Sensor
    G01599445Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE .
  3. Install the mounting bolts.

    Tighten 

    Tighten the mounting bolts to 3.5 N.m (27 lb in).

  4. Install the electrical connector.
  5. Install the negative battery cables.
    Fig 2: Boost Sensor Mounting Bolts
    G01599446Courtesy of GENERAL MOTORS CORP.