FixVault

Installation Procedure

  1. Connect the harness connector to the traction control switch.
  2. Install the traction control switch (2) into the instrument panel (IP) assembly (3), making sure that all of the switch retaining tabs (1) are engaged.
  3. Install instrument panel (IP) bezel.