Installation Procedure
- Install each wire and terminal in the new junction block. Refer to Electrical Center Identification Views .
- Rewrap the wrapping (3) on the wiring harness.
- Install the junction block (2) to the instrument panel with the screw (1).
- Install the left insulator/closeout panel. Refer to Closeout/Insulator Panel Replacement - Left in Instrument Panel, Gages, and Console.