FixVault

Installation Procedure

  1. Install the battery insulator, if necessary.
  2. Install the battery.
    Fig 1: View Of Battery & Insulator
    GM662922Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
  3. Install the battery hold down retainer and bolt.

    Tighten:  Tighten the bolt to 25 N.m (18 lb ft).

  4. Install the front end diagonal brace and bolts.
    Fig 2: View Of Front End Diagonal Brace & Bolts
    GM662921Courtesy of GENERAL MOTORS CORP.

    Tighten:  Tighten the bolts to 9 N.m (80 lb in).

  5. Connect the positive battery cable.
    Fig 3: View Of Battery & Positive Battery Cable
    GM662504Courtesy of GENERAL MOTORS CORP.

    Tighten:  Tighten the bolt to 17 N.m (13 lb ft).

  6. Snap the positive battery cable cap closed.
  7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure (Single Battery)  or Battery Negative Cable Disconnect/Connect Procedure (Auxiliary Battery) .