Installation Procedure
- Install Battery Positive Junction Block Cable (1).
- Engage Retainer (2) - [2x]
- Install Battery Positive Junction Block Cable (2).
- Install Battery Positive Junction Block Cable Nut (1) and tighten [2x] 12 N.m (106 lb in)
- Install Junction Block Cover (2).
- Engage Retaining Tab (1) - [2x]
- Close Battery Distribution Engine Compartment Fuse Block Cover (1).
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection (KL9)
CAUTION:
Refer to Fastener Caution