Installation Procedure
- Install Engine Wiring Harness Junction Block (1).
- Engage Retaining Tab (1) - [6x]
- Install Engine Wiring Harness Junction Block Mounting Bolt (1) and tighten [3x] 7 N.m (62 lb in)
- Install Wiring Harness Terminal (4) - [5x]
- Install Engine Wiring Harness Junction Block Nut (1) and tighten [5x] 4.7 N.m (42 lb in)
- Install Battery Positive Junction Block Cable (3).
- Install Battery Positive Junction Block Cable Nut (2) and tighten 12 N.m (106 lb in)
- Install Junction Block Cover (2).
- Engage Retaining Tab (1) - [2x]
- Install Engine Wiring Harness Junction Block Cover (2).
- Engage Retaining Tab (1) - [3x]
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (KL9)
CAUTION:
Refer to Fastener Caution