FixVault

Ground Circuit Inspection

■ Open check 

  1. IG "OFF". Disconnect FPCM connector.
  2. Measure the resistance between ground terminal of FPCM harness connector and chassis ground.

    Specification:  Approx. below 1Ω

  3. Is the measured resistance within specification?

    YES 

    NO