FixVault

Repair Procedures: Installation

  1. Install in the reverse order of removal.

Accelerator pedal module installation bolt: 

8.8 ~ 13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)