FixVault

Signal Circuit Inspection

  1. IG "OFF".
  2. Disconnect HO2S (S1/B1) connector and ECM connector.
  3. Measure the resistance between both ends of the HO2S (S1/B1) Nernst Voltage terminal harness.

    Measure the resistance between both ends of the HO2S (S1/B1) Vertual Ground Output terminal harness.

    Measure the resistance between both ends of the HO2S (S1/B1) Current Adjust terminal harness.

    Measure the resistance between both ends of the HO2S (S1/B1) Current Pump terminal harness.

    Specification:  Approx. 0Ω

  4. Is the measured resistance within specification?

    YES 

    NO