FixVault

Repair Procedures: Installation

  1. Install the AVN Head Unit after connecting the AVN Head Unit connectors and cable.
  2. Install the heater and air conditioner control unit.
  3. Connect the negative (-) battery terminal.
CAUTION:
  • Make sure that the cables and connectors are plugged in properly.
  • Check the AVN system for normal operation.