FixVault

Repair Procedures: Installation

  1. Install in the reverse order of removal.

    Filler-Neck Assembly Installation Nut: 

    3.9 - 5.9 N.m (0.4 - 0.6 kgf.m, 2.9 - 4.3 lbf.ft)