FixVault

Repair Procedures: Inspection

  1. Switch "OFF" the ignition.
  2. Disconnect the knock sensor connector.
  3. Measure resistance between the injector terminals 1 and 2.
  4. Check that the resistance is within the specification.

Specification:  About 4.87 MΩ [20°C (68°F)]