FixVault

Repair Procedures: Installation

  1. Install the front monitor after connecting the connector.
  2. Install the cluster fascia upper garnish.
    CAUTION:
    • Make sure that the cables and connectors are plugged in properly.
    • Check the AVN system for normal operation.