FixVault

Installation Procedure

    IMPORTANT: Do not torque the fasteners until they have all have been started.
    Fig 1: Rocker Panel Protector
    GM797217Courtesy of GENERAL MOTORS CORP.
  1. Install the rocker panel protector to the vehicle.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Loosely install all of the mounting bolts.

    Tighten:  Tighten the bolts to 50 N.m (37 lb ft).

  4. Install the EVAP canister vent valve bracket. Refer to EVAP CANISTER VENT VALVE .
  5. Install the assist step if equipped. Refer to Assist Step Replacement (Tubular BVE)  or Assist Step Replacement (Removable U Step) .
  6. Lower the vehicle.