Installation Procedure
WARNING: This page is about a different car, the 2008 Isuzu i-370, 2008 Isuzu i-290, 2008 GMC Canyon, and 2008 Chevrolet Colorado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the nuts securing the rollover sensor to the floor panel.
Tighten: Tighten the screws to 10 N.m (88 lb in).
- Connect the electrical connectors.
- Install the carpet. Refer to Floor Panel Carpet Replacement .
- Enable the SIR system. Refer to SIR Disabling and Enabling .
NOTE:
Refer to Fastener Notice
.