FixVault

Signal Circuit Inspection

  1. Check for open in signal circuit.
    1. Measure resistance between terminals 5 of the sensor harness connector and 56 of the PCM harness connector.

      Specification: Approx. 0Ω

      Fig 1: Measuring Resistance Between Terminals 5 Of Sensor Harness Connector And 56 Of PCM Harness Connector
      G03842695Courtesy of HYUNDAI MOTOR CO.
    2. Is resistance within the specification?

      YES 

      • Go to next step as below.

      NO 

  2. Check for short to battery in signal circuit.
    1. Ignition "ON" & Engine "OFF".
    2. With IATS and PCM connector still disconnected, measure voltage between terminals 5 of sensor harness connector and 56 of the PCM harness connector.

      Specification : Approx. 0V

      Fig 2: Measuring Voltage Between Terminals 5 Of Sensor Harness Connector And 56 Of PCM Harness Connector
      G03842696Courtesy of HYUNDAI MOTOR CO.
    3. Is voltage within the specification?

      YES 

      NO