Intake Manifold: Installation
Install the intake manifold and delivery pipe reversing the order of the removal procedure.
Tightening torque
Intake manifold:
12 ~ 15 Nm (120 ~ 150 kg.cm, 9 ~ 11 lb. ft)
Surge tank stay:
15 ~ 20 Nm (150 ~ 200 kg.cm, 11 ~ 14 lb. ft)