FixVault

Signal Circuit Inspection

  1. Check short to ground inspection
    1. Key "OFF".
    2. Disconnect P/S pressure sensor connector and PCM connector.
    3. Measure the resistance between terminal 2 of P/S pressure sensor harness connector and chassis ground.

      Specification: Infinite

    4. Is the measured resistance within specification ?

      YES 

      • Go to  2 "Check open in harness" procedure.

      NO 

  2. Check open in harness
    1. Key "OFF".
    2. Disconnect P/S pressure sensor connector and PCM connector.
    3. Measure the resistance between terminal 2 of P/S pressure sensor harness connector and terminal 46 of PCM connector.

      Specification: Approx. below 1Ω

    4. Is the measured resistance within specification ?

      YES 

      NO