FixVault

Ground Circuit Inspection

  1. Key "OFF".
  2. Disconnect the P/S pressure sensor connector.
  3. Key "ON"
  4. Measure the voltage between terminal 3 of P/S pressure sensor harness connector and chassis ground. (Fig A)
  5. Measure the voltage between terminal 3 and terminal 1 of P/S pressure sensor harness connector. (Fig B)

    Specification: The Difference between "A" and "B" is below 200mV.

  6. Is the measured voltage within specification ?

    YES 

    NO