FixVault

Ground Circuit Inspection

  1. IG "OFF" and disconnect TPS connector.
  2. IG "ON" and ENG "OFF"
  3. Measure voltage between terminal 1 of TPS harness connector and chassis ground.
  4. Measure voltage between terminals 1 and 5 of TPS harness connector.

    Specification: Measurement "A" - Measurement `B' = Approx. below 200mV

  5. Is the measured voltage within specification?

    YES 

    NO