FixVault

Ground Circuit Inspection

  1. IG "OFF" and disconnect FTPS connector and then IG "ON"
  2. Measure voltage between terminal 1 of FTPS harness connector and chassis ground.
  3. Measure voltage between terminal 1 and 2 of FTPS harness connector.

    Specification: Voltage difference between Measurement "A" and "B" is below 200mV.

  4. Is the measured voltage within specification?

    YES 

    NO