Front Upper Arm: Installation
- Install the two upper arm mounting bolts (A) to the body.
Tightening torque Nm (kgf.m, lb-ft):
55 ~ 65 (5.5 ~ 6.5, 39.8 ~ 47.0)
- Install the front strut assembly (Refer to INSTALLATION ).
- Install the upper arm ball joint self-locking nut (A) and the snap pin (B).
Tightening torque Nm (kgf.m, lb-ft):
35 ~ 45 (3.5 ~ 4.5, 25.3 ~ 32.5)
- Install the wheel and the tire (A) to the front hub (B).
Tightening torque Nm (kgf.m, lb-ft):
90 ~ 110 (9 ~ 11, 65.1 ~ 79.5)
CAUTION: Be careful not to damage the hub bolts (C) when installing the front wheel and tire (A).