FixVault

Ground Circuit Inspection

  1. IG "OFF"
  2. Disconnect MAPS connector and then IG "ON".
  3. Measure the voltage between terminal 1 of MAPS harness connector.
  4. Measure the voltage between terminal 1 and 3 of MAPS harness connector.

    Specification: Voltage difference and "A" and B" is below 200mV

  5. Is the measured voltage within the specification?

    YES 

    NO