FixVault

Signal Circuit Inspection

  1. Ignition "ON" & Engine "OFF"
  2. Measure voltage between terminal 3 of the FTPS harness connector and chassis ground

    Specification : Approx. 5V

  3. Is voltage within the specification?

    YES 

    • Go to next step as below

    NO