FixVault

Ground Circuit Inspection

  1. IG "OFF"
  2. Disconnect FLS & Instrument cluster connector.
  3. Measure resistance between terminal 6 of FLS harness connector and chassis ground.

    Specification : Approx. below 1Ω

  4. Is the measured resistance within specification ?

    YES 

    NO