Control Circuit Inspection

  1. Check short in harness
    1. IG "OFF".
    2. Disconnect Main Relay and PCM connector.
    3. Measure resistance between terminal 86 of Main Relay and chassis ground.
    4. Measure resistance between terminals 86 and 85 of Main Relay.

      Specification : Infinite

    5. Is the measured resistance within specification ?

      YES 

      • Go to "Check open in coil control" as follows.

      NO 

  2. Check open in harness
    1. IG "OFF".
    2. Disconnect Main Relay and PCM connector.
    3. Measure resistance between harness terminal 86 of Main Relay and harness terminal 43 of PCM harness connector (C130-A).

      Specification : Approx. below 1Ω

    4. Is the measured resistance within specifications ?

      YES 

      NO