FixVault

Power Circuit Inspection

  1. IG "OFF" and disconnect FTPS connector.
  2. IG "ON" and ENG "OFF"
  3. Measure voltage between terminal 1 of FTPS harness connector and chassis ground.

    Specification: Approx. 5V

  4. Is the measured voltage within specification?

    YES 

    NO