FixVault

Signal Circuit Inspection

  1. Check Voltage
    1. IG "OFF" and disconnect Fuel Sender & Fuel Pump Motor connector and PCM connector.
    2. IG "ON" & ENG "OFF"
    3. Measure voltage between terminal 29 of PCM harness connector and chassis ground.

      Specification: Approx. 11 ~ 12V

    4. Is the measured voltage within specification?

      YES 

      NO