FixVault

Control Circuit Inspection

  1. IG "OFF" & disconnect HO2S (B1/S1) connector.
  2. IG "ON" & ENG "OFF".
  3. Measure voltage between terminal 2 of HO2S (B1/S1) harness connector and chassis ground.

    Specification: Approx. 0 V

  4. Is the measured voltage within specification?

    YES 

    NO