FixVault

Control Circuit Inspection

  1. Check short to ground in harness.
    1. IG "OFF" and disconnect HO2S (B2/S2) connector.
    2. Measure resistance between terminal 2 of HO2S (B2/S2) harness connector and chassis ground.

      Specification: Infinite

    3. Is the measured resistance within specification?

      YES 

      • Go to HO2S (B2/S2) " 2Check Open in harness" as follows.

      NO 

  2. Check open in harness
    1. IG "OFF" and disconnect HO2S (B2/S2) and PCM connector.
    2. Measure resistance between terminal 2 of HO2S (B2/S2) harness connector and terminal 73 of PCM harness connector.

      Specification: Approx. below 1Ω

    3. Is the measured resistance within specification?

      YES 

      NO