Component Inspection 2
- IG KEY OFF.
- Remove the TCU.
- Measure the resistance of "SLC1" "SLC2" "SLC3" "SLB1" solenoid-valves.
Specification : Approx. 5.0 ~ 5.6Ω (20°C)
- Is resistance within specifications?
YES:
- Substitute with a known-good PCM/TCM and check for proper operation. If the problem is corrected, replace PCM/TCM as necessary and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NO:
- Replace solenoid-valve as necessary and Go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NOTE: When replacing the TCU, must perform the N position learning and the Initial learning, (refer to 'HOW TO PERFORM N POSITION LEARNING ' and 'HOW TO PERFORM INITIAL LEARNING ')