FixVault

Control Circuit Inspection

  1. IG "OFF".
  2. Disconnect A/C relay and ECM/PCM harness connector.
  3. IG "ON".
  4. Measure the resistance between terminal 5 of A/C relay harness connector and terminal 38/C01-2 of ECM/PCM harness connector (AT).

    Measure the resistance between terminal 5 of A/C relay harness connector and terminal 45/C01 of ECM/PCM harness connector (MT).

    Specification:  below 1 Ω

    Fig 1: Measuring Resistance Between Terminal 5 Of A/C Relay Harness Connector And Terminal 45/C01 Of ECM/PCM Harness Connector
    G06130802Courtesy of HYUNDAI MOTOR CO.
  5. Is the measured resistance within specification?

    YES 

    NO