FixVault

Signal Circuit Inspection

  1. IG "OFF" and disconnect HO2S(B2/S1) connector.
  2. IG "ON".
  3. Measure voltage between signal terminal of HO2S(B2/S2) harness connector and chassis ground.

    Specification: 

    Approx.2.0~2.4V - when pumping current is ON

    Approx. 0.6~0.9V - when pumping current is OFF

    Fig 1: Measuring Voltage Between Signal Terminal Of HO2S(B2/S2) Harness Connector And Chassis Ground
    G07251486Courtesy of HYUNDAI MOTOR CO.
  4. Is the measured voltage within specification?

    YES 

    NO