FixVault

Signal Circuit Inspection

  1. IG "OFF" and disconnect APS connector and ECM connector.
  2. Measure resistance between APS2 signal and APS1 power terminals of APS harness connector.
  3. Measure resistance between APS2 signal and APS2 power terminals of APS harness connector.

    Specification:  Infinite

  4. Is the measured resistance within specification?

    YES 

    NO