FixVault

Changing The Shift Cable

  1. Remove the Floor Console Assembly.

    (Refer to: INTERIOR (Console) of BD procedure).

  2. Remove the Control Cable (A).
    Fig 1: Removing Control Cable
    G10608155Courtesy of HYUNDAI MOTOR AMERICA
  3. Remove the Retainer (A) and Nut (B).

    Tightening Torque: 

    11.8 ~ 14.7 N.m (1.2 ~ 1.5 kgf.m, 8.7 ~ 10.8 lb-ft)

    Fig 2: Retainer And Nut
    G10608156Courtesy of HYUNDAI MOTOR AMERICA
  4. Remove the Cable (B) from the Cable Bracket (A) on the A/T.
  5. Remove the Nut (C) from the Manual Control Lever.
  6. Remove the Shift Cable by pulling it toward the interior.

    Tightening Torque: 

    9.8 ~ 14.7 N.m (1.0 ~ 1.5 kgf.m, 7.2 ~ 10.8 lb-ft)

    Fig 3: Cable Bracket, Cable And Nut
    G10608157Courtesy of HYUNDAI MOTOR AMERICA
  7. Installation is the reverse of removal.
    NOTE:
    • Install the cable after placing the Shift Lever and the Transmission Manual Control Lever in the 'N' position.
    • Adjust the Control Cable.

    (Refer to: Control Cable Adjustment Procedure).