FixVault

Ground Circuit Inspection

■ Check open in harness 

  1. IG "OFF" and disconnect OTS connector and then IG "ON".
  2. Measure voltage between signal terminal of OTS harness connector and chassis ground. (Measurement "A")
  3. Measure voltage between signal and ground terminals of OTS harness connector. (Measurement "B")

    Specification:  Voltage difference between measurement "A" and "B" is below 200 mV.

    Fig 1: Measuring Voltage Between Signal Terminal Of OTS Harness Connector And Chassis Ground (Measurement A)
    G10373143Courtesy of HYUNDAI MOTOR AMERICA
    Fig 2: Measuring Voltage Between Signal And Ground Terminals Of OTS Harness Connector (Measurement B)
    G10373144Courtesy of HYUNDAI MOTOR AMERICA
  4. Is the measured voltage within specification?

    YES 

    NO