FixVault

Repair Procedures: Installation: Notes

  1. Install in the reverse order of removal.

    Battery (-) terminal installation: 

    7.8 - 9.8 N.m (0.8 - 1.0 kgf.m, 5.8 - 7.2 lb-ft)

    Battery (+) terminal installation: 

    7.8 - 9.8 N.m (0.8 - 1.0 kgf.m, 5.8 - 7.2 lb-ft)

    Battery mounting bracket and the insulation pad installation: 

    19.6 - 29.4 N.m (2.0 - 3.0 kgf.m, 14.5 - 30.4 lb-ft)

    NOTE:
    • When installing the battery, fix the mounting bracket on the tray correctly.