FixVault

Feedback Position Sensor

  1. Connect the GDS to the data link connector.
  2. Perform the fully open and the fully closing operation of the EEGR valve by using the actuation test.
  3. Check that the voltage is within the specification
VOLTAGE SPECIFICATIONS

Item Specification
Sensor Power (V) 5
Closed Voltage (V) 3.9 - 4.5
Opened Voltage (V) 0.7 - 1.3