FixVault

Inhibitor Switch

  1. Using an ohmmeter, check for continuity between Green wire terminal and Brown wire terminal. With shift lever in "N" or "P" positions continuity should be present. With shift lever in any other position, continuity should not be present.
  2. Check for continuity between Green wire terminal and Gray/Blue wire terminal. With shift lever in "N" or "P" positions continuity should be present. With shift lever in any other position, continuity should not be present.